OEE is availability × performance × quality. Enter one shift's numbers to see where the losses actually hide — and the gap to world-class (85%).

01 Availability

min
min

02 Performance

sec

03 Quality

Result
Live
Overall OEE
Availability
Performance
Quality
Gap to 85%
Reading

Know which loss to attack first.

Whether the drag is availability, speed, or scrap changes what you should buy or fix. Get a read on the highest-return move.

Request assessment

How the numbers are figured

Availability
Run time ÷ planned time, where run time is planned time minus unplanned downtime.
Performance
(Ideal cycle time × total units) ÷ run time. Capped at 100% — if it exceeds that, your ideal cycle time is set too slow.
Quality
Good units ÷ total units produced. First-pass good only; reworked pieces don't count as good.
World-class
85% OEE is the common benchmark (roughly 90% availability × 95% performance × 99.9% quality).